| Home | News |

GEODEX MINERALS LTD.

Suite 450 – 800 West Pender Street,

Vancouver, B.C., Canada, V6C-2V6


Tel: 604-689-7771

FX: 604-689-5528

Toll Free: 888-999-3500


E-Mail: Info@Geodexminerals.com

  • Geodex Announces Base Metal, Tin and Indium Assays From Four Prospects in the Mount Pleasant Camp, New Brunswick

  • New Geodex Resource Model increases Sisson Brook Tungsten-Molybdenum-Copper deposit to 243.9 million tonnes ‘Measured and Indicated’ and 154.4 million tonnes ‘Inferred’.

  • Geodex Appoints Two New Directors To Its Board and Provides Sisson Brook Progress Update

  • Geodex Reports Further Drill Assays From the Molybdenum-Rich East Flank Zone at Sisson Brook, New Brunswick. Senior Project Engineer Hired to Coordinate Project Development

  • Geodex reports drill results from the northern tungsten-copper zones (Zones I and II) on the Sisson Brook property, New Brunswick

  • Geodex Announces Private Placement Closing

  • Geodex Adopts Shareholders’ Rights Plan

  • Geodex reports acquisition of three new claim blocks near the Sisson Brook Tungsten-Molybdenum-Copper Deposit, New Brunswick.

  • Non Brokered Private Placement

  • Geodex Closes Acquisition of Controlling Interest in Champlain Resources Inc.

  • | Investment Opportunities | Investing Articles | Financial News | Resources | Radio Show Podcasts |


    Geodex Minerals Financial News

    Geodex reports drill results from the northern tungsten-copper zones (Zones I and II) on the Sisson Brook property, New Brunswick

    VANCOUVER, Feb. 13 /CNW Telbec/ - Geodex Minerals Ltd. (TSXV - GXM) ('the
    Company') is pleased to report completed results from the northern
    tungsten-copper zones on the Sisson Brook property in New Brunswick.

    Geodex has focussed its attention to date on the large
    tungsten-molybdenum resource in Zone III which saw the bulk (16,000 m) of 2007
    drilling on the property and was the subject of a Scoping Study (Preliminary
    Economic Assessment) completed by Wardrop Engineering in November 2007. A new
    resource estimate, incorporating all of the 2007 drilling, will be ready by
    April this year and will form the basis for a pre-feasibility study to be
    completed by Wardrop in September 2008. Geodex anticipates that the new
    resource estimate will up-grade most of the Zone III resources to the
    'measured and indicated' category.

    However, two northern zones (Zones I and II) were also discovered and
    drilled by Texasgulf Minerals in 1979 and 1980. These were reported to have a
    non - 43-101 compliant resource in copper and tungsten at that time. Both are
    elongate, parallel deposits, lying north of Zone III, apparently contiguous
    with it and extending over a strike length of 800 m. At the present time, the
    thin cover of glacial till obscures their exact relationship to Zone III. It
    is also not clear why their trend is more west of north or why they contain
    much more copper, although weaker in molybdenum.

    Geodex completed 3151 m of drilling (15 holes) in 2007 on these northern
    zones, drilling the central 400 m length on 50 m sections. This new footage is
    complemented by one 2006 hole (SB-06-30) and previous Texasgulf holes on 100 m
    sections for 100 m to the south of this central section and for 300 m to the
    north. In conjunction with the new block model and resource estimate for Zone
    III due in April 2008, a first resource estimate will be prepared also for the
    northern Zones I and II. The pre-feasibility report will determine their
    contribution to the overall project development.

    Results are tabulated in Table 1 below.


    Table 1. Assay Results from Zones I and II, Sisson Brook Project.
    -------

    ---------------------------------------------------------------------
    Hole Grid Incl. Azm. Hole From To Interval
    ---- Location ----- ---- Length ---- -- --------
    -------- ------ (m) (m) (m)
    (m)
    ---------------------------------------------------------------------
    SB-07-09 0+50S 1+30E -55 270 307 63.50 162.00 98.50
    ---------------------------------------------------------------------
    SB-07-12 0+50S 1+94E -55 273 246 181.50 229.50 48.00
    ---------------------------------------------------------------------
    SB-07-15 0+50S 0+70E -55 272 245 11.00 212.00 201.00
    ---------------------------------------------------------------------
    includes
    ---------------------------------------------------------------------
    11.00 75.50 64.50
    ---------------------------------------------------------------------
    SB-07-18 1+00S 0+52E -55 272 260 8.00 43.00 35.00
    ---------------------------------------------------------------------
    and
    ---------------------------------------------------------------------
    138.50 251.00 112.50
    ---------------------------------------------------------------------
    SB-07-20 1+50S 1+50E -55 272 290 15.00 156.00 141.00
    ---------------------------------------------------------------------
    SB-07-23 1+50S 0+60E -55 271 164 38.00 144.50 106.50
    ---------------------------------------------------------------------
    SB-07-25 2+00S 1+02E -55 97 83 36.50 80.00 43.50
    ---------------------------------------------------------------------
    SB-07-27 2+00S 1+02E -55 272 254 48.50 60.50 12.00
    ---------------------------------------------------------------------
    and
    ---------------------------------------------------------------------
    173.00 221.00 48.00
    ---------------------------------------------------------------------
    SB-07-30 2+00S 0+22E -55 273 221 173.00 215.00 42.00
    ---------------------------------------------------------------------
    SB-07-31 0+50N 1+82E -55 272 287 229.50 264.00 34.50
    ---------------------------------------------------------------------
    SB-07-34 0+50N 1+22E -45 272 199 95.00 164.50 69.50
    ---------------------------------------------------------------------
    includes
    ---------------------------------------------------------------------
    106.00 119.50 13.50
    ---------------------------------------------------------------------
    SB-07-36 0+50N 0+22W -55 272 161 102.50 125.00 22.50
    ---------------------------------------------------------------------
    SB-07-37 1+00N 0+28E -55 272 224 160.00 208.00 48.00
    ---------------------------------------------------------------------
    SB-07-39 1+00N 0+28E -55 92 98 38.00 69.50 31.50
    ---------------------------------------------------------------------
    SB-07-41 1+00N 0+30W -55 285 112 39.50 84.50 45.00
    ---------------------------------------------------------------------

    ---------------------------------------------------------------------
    SB-06-30 1+10S 1+40E -45 277 255 19.50 103.50 84.00
    ---------------------------------------------------------------------
    (Note: SB-06-30 was drilled in 2006 and
    the results announced in a News Release
    dated February 13, 2007) includes
    ---------------------------------------------------------------------
    24.00 34.50 10.50
    ---------------------------------------------------------------------

    ---------------------------------------------------------------------
    Hole % WO3 % Mo % Cu
    ---- ----- ---- ----



    ---------------------------------------------------------------------
    SB-07-09 0.095 0.005 0.232
    ---------------------------------------------------------------------
    SB-07-12 0.177 0.006 0.436
    ---------------------------------------------------------------------
    SB-07-15 0.060 0.077
    ---------------------------------------------------------------------

    ---------------------------------------------------------------------
    0.105 0.140
    ---------------------------------------------------------------------
    SB-07-18 0.093 0.007 0.051
    ---------------------------------------------------------------------

    ---------------------------------------------------------------------
    0.061 0.005 0.114
    ---------------------------------------------------------------------
    SB-07-20 0.074 0.008 0.061
    ---------------------------------------------------------------------
    SB-07-23 0.054 0.006 0.048
    ---------------------------------------------------------------------
    SB-07-25 0.081 0.005 0.038
    ---------------------------------------------------------------------
    SB-07-27 0.055 0.065
    ---------------------------------------------------------------------

    ---------------------------------------------------------------------
    0.033 0.015 0.035
    ---------------------------------------------------------------------
    SB-07-30 0.181 0.013
    ---------------------------------------------------------------------
    SB-07-31 0.058 0.115
    ---------------------------------------------------------------------
    SB-07-34 0.144 0.236
    ---------------------------------------------------------------------

    ---------------------------------------------------------------------
    0.430 0.500
    ---------------------------------------------------------------------
    SB-07-36 0.062 0.070
    ---------------------------------------------------------------------
    SB-07-37 0.105 0.005 0.078
    ---------------------------------------------------------------------
    SB-07-39 0.182 0.011 0.143
    ---------------------------------------------------------------------
    SB-07-41 0.105 0.184
    ---------------------------------------------------------------------

    ---------------------------------------------------------------------
    SB-06-30 0.100 0.003 0.102
    ---------------------------------------------------------------------
    (Note: SB-06-30 was drilled in 2006 and
    the results announced in a News Release
    dated February 13, 2007)
    ---------------------------------------------------------------------
    0.428 0.005 0.251
    ---------------------------------------------------------------------
    >>

    Drilling has now ended on the Sisson Brook property, following three
    holes put in east of the East Flank zone and carrying out the first drilling
    (2 holes)on the high-grade Goodwin tungsten skarn which was found late in 2006
    (News Release July 19, 2007). It lies three kilometres to the north of Zone
    III. Several regional targets will see preliminary testing before the drill is
    stood down in mid-February for maintenance. Drilling is planned to resume in
    early April, initially with three rigs.

    Jack Marr, M.Sc., P.Geo., is the in-house QP for this project.

    Forward Looking Statement
    -------------------------

    Certain information regarding the Company contained in this press release
    may constitute forward-looking statements within the meaning of applicable
    securities laws. Forward-looking statements may include estimates, plans,
    opinions, forecasts, projections or other statements that are not statements
    of fact. Although the Company believes that expectations reflected in such
    forward-looking statements are reasonable, it can give no assurance that such
    expectations will prove to have been correct. The Company cautions that actual
    performance will be affected by a number of factors, many of which are beyond
    the Company's control, and that future events and results may vary
    substantially from what the Company currently foresees.

    On Behalf of the Board of Directors
    -----------------------------------
    GEODEX MINERALS LTD.

    'Jack M. Maris'

    Jack M. Maris,
    President

    For further information: Christopher R. Anderson, V.P Business
    Development, (604) 689-7771, Toll free: 1-888-999-3500,
    info@geodexminerals.com; Visit our website at www.geodexminerals.com;

     
     
    | Our services | Airways | Our Clients | Our Team | Resources | News | Contact Us |
    | Investment Opportunities | Financial News | Resources | Radio Show Podcasts |

    2007 Sol Media International, Ltd. all rights reserverd